Halt delivery of 787 E24 Dreamliners

Halt delivery of 787 E24 Dreamliners

Once again, aircraft manufacturer Boeing is in trouble with the US aviation authorities. There are 12 planes in storage awaiting delivery, but Boeing has not delivered the type of plane since the end of January.

published:

US planemaker Boeing has halted deliveries of the 787 Dreamliner due to a documentation issue, according to the US aviation authority. Federal Aviation Administration (FAA).

Boeing has not delivered Dreamliners since January 26. Now, about 100 newly built aircraft are awaiting delivery, according to him The Wall Street Journal.

The component must be analyzed

Last week, the company stopped assembling the new aircraft. That break has now been cancelled, but a documentation issue has meant Boeing has held deliveries until a solution can be found.

Read on E24+

Full Overview: These are the highest paying occupations in the country

Boeing has paused deliveries of 787 Dreamliners after notifying the Federal Aviation Administration that the company is conducting further analysis of an airframe component. The US Aviation Authority said in a statement that deliveries will not resume until the FAA is satisfied and the issue is resolved.

The FAA added that it is working with Boeing to determine what to do with the newly delivered planes.

According to the WSJ, aircraft type deliveries are central to the company’s plan to increase revenue and cash reserves.

Boeing has not yet commented on this matter.

stop earlier

This isn’t the first time deliveries of the 787 Dreamliner have been halted. Since the company began producing the type of aircraft, which are often used on long-distance routes, they have caused problems.

See also  The war in Ukraine - live like a fucking animal

In May 2021, Boeing halted fuselage deliveries for the second time in less than a year. Then, the FAA determined there were problems with Boeing’s way of evaluating the plane, he writes CNBC.

The previous year, the company had acknowledged incorrect spacing on some parts of the 787, including the fuselage. Deliveries were halted for five months.

Norwegian airline NorseAtlantic uses Dreamliners. In the past, Norwegian Air also did this, but they got rid of the aircraft model when the long-haul project closed.

In 2018, the Norwegian company had to replace the engines in all of its aircraft. They were all sent to the shop after having been in operation for between a few months and four and a half years, after cracks had formed in the engines’ turbines.

Fighter production ceased

On Thursday, it also became known that Boeing plans to discontinue production of the F / A-18 Super Hornet fighter at the end of 2025.

Instead, the aircraft manufacturer will shift its focus and focus its work on winning the sixth-generation fighter jet race Reuters.

Boeing said it expects to hire more workers and build three new facilities in St. Louis.

Jabori Obasanjo

Jabori Obasanjo

"Coffee trailblazer. Certified pop culture lover. Infuriatingly humble gamer."

Leave a Reply

Your email address will not be published. Required fields are marked *